- 1、本文档共59页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACT
c::.
、
、
A large number of construction practices at home and abroad have proved that effectíve project management plays an important role in engineering field,which can promote the quality of a project,reduce the risk of safety incidents,shorten the duration and save cost. Schedule control of engíneering projects is one of the project control goals,which not only has an effect on the cost of a project ,but also has a direct bearing on the success or fail of the entire engineering project.叽lerefore,it is
of practice value to study on the schedule management of engineering projects.
Based on theories of project schedule management ,this thesis analyzes 由e factors 由at have an ínfluence on the schedule plan of LUDA oil field development engineering project and its relevant control measures. Inner factors and outer factors
th创 affect the critical activities of project schedule 盯e identified and analyzed respectively. Afterwards ,technical measures,economical meas1ires,manageplent practices,and organizational measures have been taken ín connection with each factor
to insure 由e achievement of schedule goal of LUDA project on the premise of quality and safety. Economical benefits have been achiev以i by LUDA oil field development
engineering project. In connection with c阳ent problems existing in schedule
management of LUDA project ,advice on disposal measures and proposals has been given to promote the schedule management level of Chinese ?ffshore oil field development engineering projects.ηle further research can focus on the effects 由at
cost and quality have on schedule management.
Key words: Offshore Oi1 Development; Engineering Project; Schedule Management; Critical Path Method
目录
第一章 绪论1
1.1研究背景与意义. 1
1.1.1 中国海洋石油发展现状1
1.1.2 世界海洋石油发展现状, 2
,. 1.1.3 研究意义.,.,.,.,, 2
、项目进度管理研究现状...,,..,..,..,.,, 3
、
研究内容与方法,,,,..,..., .4
1.4 研究思路,..,..,,.., 5
第二章 项目进度管理理论. ? .,, ...,.6
2,1 项目进度管理的原则. ,,,,,,,,,,,.,,,..,...6
2. 1.1项目进皮管理的弹性原则....,..,.,.,., ...6
2. 1.2
您可能关注的文档
- 国际直接投资与产业结构之研究-国际贸易专业论文.docx
- 哈尔滨市艺术表演团体管理体制改革分析-公共管理专业论文.docx
- 广西主要作物秸秆腐解特征研究-土壤学专业论文.docx
- 广州市养老机构体育服务人才配备现状及对策研究-体育学专业论文.docx
- 灌区水资源合理配置与高效利用分析-水利水电工程专业论文.docx
- 广西马尾松天然林不同种源ISSR遗传多样性分析-森林培育专业论文.docx
- 广西船舶过闸费管理问题研究-交通运输工程专业论文.docx
- 国内外产学研合作创新的比较研究-技术经济及管理专业论文.docx
- 光动力联合阿司匹林对胆管癌QBC939细胞周期和凋亡的影响-胆管癌的综合治疗专业论文.docx
- 过氯酸铵对家兔肺组织致纤维化作用的研究-劳动卫生与环境卫生学专业论文.docx
文档评论(0)