哈尔滨电站工程有限责任公司费用控制体系研究工商管理专业论文.docxVIP

哈尔滨电站工程有限责任公司费用控制体系研究工商管理专业论文.docx

  1. 1、本文档共58页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
哈尔滨工业大学工商管理硕士学位论文 哈尔滨工业大学工商管理硕士学位论文 - - II - Abstract As a brink-science, power project EPC(engineering, procurement, commission) involved a lot of special fields, which is including not only the engineering technology, economic traffic, financial ,tax insurance, but also social politics, law-system, entironment, geo-economy and so on. effected by the world economy which still went on with the driving developing rate as 5.2% in 2007, Power engineer project kept on the high advanced rate, the most part to compose the building of the foundation establishments. Upgraded the management details, as a increasing numbers of international project EPC contractors expect to continue monopolizing the profession market with the completed services. Form 2007, world economy has been faced on the inflexion with the USA economical weak gliding. Forced by the price rising of the materials, energy as well as the globe inflation, the modern international enterprises are focus on the fields in cost, plan, quality and service. It is the most importance that they emphases on how to keep the old customers, explored the new market and pursue the value projects. By using Harbin Power Engineering Co. Ltd. for the sample in this paper, through carefully research and study to the inner cost system. Consulting the model of management in the right fields with the knowledge on integration, scope, cost, quality, communication, procurement, human resource and risk, which is from the PMBOK published by the PMI (Project Management Institute). Attempted to find the problems on the inner cost controlling of the project management in the international EPC contractors and analyzed the background reasons on the view of the management and performance, the author wished rebuilt the management system and set up the information system based on POWERON through the improving of the manage model and enterprise culture, in order to resolve the chop points in the field

文档评论(0)

1234554321 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档