- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科毕业论文(设计)外文翻译
施工项目进度控制的关键问题
院(系、部)名 称 :
专 业 名 称:
学 生 姓 名:
学 生 学 号:
指 导 教 师:
2012年 01
教务处制
PAGE 1
Construction of key problems of project progress control
Abstract
Construction progress was one of the three objectives of the project which is an important component of project management. Reasonable, scientific, efficiency of project construction schedule is the key to achieve the project objectives control. Only during the preparation stage, stage of progress of the programmer design stage, plans and implementation of construction and other links, taking full account of the favorable factors, rational coordination of limited resources, can eventually achieve the progress required by the target, to create advanced, civilization and construction process and lay a solid material foundation.
Keywords: Construction projects; Progress control; Key issues
Progress, investment, quality is the three objectives of the project; there is a relationship of mutual dependence and mutual restriction between them. Project schedule control is an important component of project management and is to ensure that project objectives control is complete the prerequisite for the realization of, to ensure the project duration, the rational use of resources, and lower costs, to prevent plan changes too big and important guarantee for improving the efficiency of project. Management should focus on the following aspects:
1. Attaches great importance to project construction preparation
Project preparation is an important component of construction production, and it is intended to project goals, resource supply and selection of construction plan, spatial layout and the various aspects of time and manpower arrangement. It also is the fundamental guarantee for the smooth conduct of civil engineering construction and equipment installation. Therefore, preparing carefully for technical before construction, materials, labor
您可能关注的文档
最近下载
- 期末测试卷(试题)-2024-2025学年人教PEP版(2024)英语三年级上册.docx VIP
- 高二年级第一次月考质量分析化学.doc VIP
- 人教部编版小学语文三年级上册期中质量检测试题(答案+评分标准).pdf VIP
- 小红书2023“家生活”趋势白皮书-青年志&安娜&奥维云网-2023-64页.pdf
- 小学生主题班会 垃圾分类(课件).pptx
- 江西省南昌市八年级上学期期中数学试卷附参考答案.pdf VIP
- QC∕T 948-2013 汽车顶部装载装置.pdf
- 2024年浙江事业单位招聘-宁波慈溪市机关事业单位编外招5人考试备考题库及答案解析.docx VIP
- 风险评估及控制管理流程 2023年ISO15189医学实验室管理体系.docx VIP
- 滴灌在园林绿化中的应用及前景.doc VIP
文档评论(0)