- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GLAST LAT Project CDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967 Section 16 EEE Parts * GLAST Large Area Telescope Gamma-ray Large Area Space Telescope Electrical, Electronic, and Electromechanical (EEE) Parts Nick Virmani Naval Research Lab, Washington DC nvirmani@ 202-767-3455 EEE Parts Selection Criteria Parts screening and qualification per GSFC-311-INST-001 level 2, superceded by EEE-INST-002, and LAT EEE Parts Program Control Plan LAT-MD-00099-1. Manufacturer’s process control and construction, policies on qualification, reliability process monitor, requalification, screening. Certification of manufacturing and assembly (Surface Mount and MCM Assembly) processes to be compatible with parts. Thermal profile of reflow equipment and process control. Parts Control Board (PCB) approval of all parts, procedures, specifications along with procurement controls and documentation Electrical testing of parts and board assemblies for extended temperature range. Derating of all parts as per PPL-21. Parts stress analysis for each board assembly prior to flight assembly. GIDEP search and review of parts from selection until launch. EEE Parts Challenges New technology parts never used in space application such as the 3.3 volt ADC, DAC, Polyswitch Fuses, ASICs, MCMs Nanoconnectors, etc. ASICs (system on chip) with million channels. Plastic Encapsulated Microcircuits (PEMs) Wide range of parts. The risk is a key issue in the decision making process. All subsystem managers, engineers, GSFC, and parts control board (PCB) have to agree for radiation, testing, screening, and qualification issues. Tight budget. EEE Parts Status ACD Front End Electronics Board – all parts approved except ASICs and MAX494 OpAmps ASICs testing procedure and plan to be prepared and to be approved by PCB. High Voltage Bias Supply (HVBS) Board – all parts approved except high voltage capacitor, inductors, etc. Plans are in process for approval of all parts. Resistor Tap N
您可能关注的文档
- File Processing课件.ppt
- Financial Institution in Hong Kong – Insurance IndustryUnder ...课件.ppt
- Financial Performance –Year ended March 31, 2002课件.ppt
- Firewalls课件.ppt
- First reading课件.ppt
- FIRST Training Resource – Volunteers课件.ppt
- FlashMX基础之十课件.ppt
- Flash基本篇课件.ppt
- FLASH课件制作课件.ppt
- Flash音频案例课件.ppt
- [中央]2023年中国电子学会招聘应届生笔试历年参考题库附带答案详解.docx
- [吉安]2023年江西吉安市青原区总工会招聘协理员笔试历年参考题库附带答案详解.docx
- [中央]中华预防医学会科普信息部工作人员招聘笔试历年参考题库附带答案详解.docx
- [保定]河北保定市第二医院招聘工作人员49人笔试历年参考题库附带答案详解.docx
- [南通]江苏南通市崇川区人民法院招聘专职人民调解员10人笔试历年参考题库附带答案详解.docx
- [厦门]2023年福建厦门市机关事务管理局非在编工作人员招聘笔试历年参考题库附带答案详解.docx
- [三明]2023年福建三明市尤溪县招聘小学幼儿园新任教师79人笔试历年参考题库附带答案详解.docx
- [哈尔滨]2023年黑龙江哈尔滨市木兰县调配事业单位工作人员笔试历年参考题库附带答案详解.docx
- [上海]2023年上海市气象局所属事业单位招聘笔试历年参考题库附带答案详解.docx
- [台州]2023年浙江台州椒江区招聘中小学教师40人笔试历年参考题库附带答案详解.docx
文档评论(0)