管井降水工程施工设计方案34124.doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
word完美格式 精心整理 学习帮手 管井降水施工方案 The construction scheme of tube well dewatering 柬埔寨安达都会广场项目 VCLP PROJECT CAMBODIA 编制单位:Sinoma HanDan Construction Co.,Ltd 编 制: compiled:__________________ 审 批: Verified: __________________ 批 准: Approved: __________________ 日 期: Date : __________________ 安达广场基坑降水施工方案 Construction Scheme for Foundation Pit Drawdown of VATTANAC Park 一、降水设计方案 I. Drawdown design scheme 1.1、设计参数 1.1. Design data 本工程降水井采用直径300mm波纹管滤管,管井共20根井深22米,井口外露500mm。 300mm corrugated filter pipe is adopted as the drawdown well and there are total 20 wells of 22m deep each. The wellhead exposes by 500mm. 1.2、降水井平面布置 1.2. Layout of drawdown well 降水井布置详见降水管井平面布置图。 The arrangement of drawdown well is shown on the layout of drawdown well. 二、施工准备 II. Construction preparation 2.1、测量放线 2.1. Surveying and setting out 测量放线依据现场测量控制点,标高采用水准仪,并根据井点布置图采用全站仪放线定位。放线经复核后报管理公司确认方可进行施工。 The surveying and setting out shall be based on the field survey control points and optical level shall be used for measuring the elevation. In addition, the total station instrument shall be used for the setting out and positioning according to the layout of well points. Setting out shall be performed after re-recheck and being reported to the management company for confirmation. 2.2、施工用电、用水配置 2.2 Electricity and water for construction 1、施工用电直接从配电房接入,50kVA能完全满足降水用电负荷。 1. The electricity for construction shall be directly connected from the switchgear room, and 50kVA can fully meet the drawdown load requirements. 2、依据用水设备和施工经验,需用水量10m3/h直径50mm管,就能满足施工用水。 2. Depending on the water equipment and based on the construction experience, the pipe of diameter 50mm with a water flow rate of 10m3/h can meet the construction requirements. 2.3、打井机械及井点设备 2.3. Well drilling rig and well point equipment 打井机械可根据工期要求变更。井点设备是由井点管、连接管、排水主管及抽水设备等组成。具体如下: The well drilling rig may very according to the schedule requirement. The well point equipmen

文档评论(0)

文档分享 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档