东莞水道特大桥设计(Design of super large bridge for Dongguan waterway).doc

东莞水道特大桥设计(Design of super large bridge for Dongguan waterway).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东莞水道特大桥设计(Design of super large bridge for Dongguan waterway) The design of Dongguan Waterway Bridge The Dongguan channel bridge is a large span steel pipe concrete arch bridge, the main span of 280m. This paper introduces the main points of design and calculation of the bridge, a reference for similar bridge design. Keywords concrete filled steel tube truss arch design in Dongguan 1 natural conditions Dongguan area belongs to the tropical monsoon climate, mild climate, adequate light. The relative humidity of 83.1%, the average annual temperature of 21 ~ 220C, the average temperature of July 28.20C, the extreme maximum temperature 37.90C. In January the average temperature of 13.40C, the extreme minimum temperature -0.50C. On the South China Sea basin, affected by the southwest monsoon, the southeast trade winds and strong typhoon activity, rainfall. But because of the terrain is flat, dynamic condition is poor, the rainstorm intensity in general. The average annual rainfall of 1700mm, the maximum annual rainfall of 2442mm, the minimum annual rainfall 1360mm, 12 hour rainfall of up to 259mm. The uneven spatial and temporal distribution of rainfall concentrated in 4 ~ September, accounting for about 80% of the annual rainfall. The local perennial wind for the East, Southeast, followed by the south wind, the maximum wind speed 34m/s. Summer and autumn will be affected by the typhoon, the average annual occurrence of typhoon 1 ~ 3 times, the wind is generally 6 ~ 9, 11 gust, the largest wind up to 12. According to the geological drilling revealed that roughly the same things on both sides of the bridge site geology. The surface is filling soil, the Quaternary alluvial formation of silt, silt and fine sand, coarse sand bars, third strong weathering, weathering and weathered marl, which strongly weathered marl only in the local distribution. Buried depth of bedrock, weathering marlite in 15.2 ~ 21.8m, 18.6 ~ 29.0m weathered marl. Saturated uniaxial compressive ultimate

文档评论(0)

seunk + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档