100万吨焦化硫铵工段设计毕业设计.doc

  1. 1、本文档共107页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
峰峰100万吨焦化硫铵工段设计 华北科技学院毕业设计 目录 TOC \o 1-3 \h \u , principles of chemical engineering, coal coking design manual, etc. Characteristics and process of design The way to recovery the ammonia from coke oven gas is bubble type saturator method. The process is as follows: the coke oven gas of condensing section into the gas preheater first. Then contacted with sulphuric acid mother liquor and generated ammonium sulfate in the saturator. And ammonium sulfate separated by subsequent operation. The gas out of saturator is sent to the crude benzol section. Saturated selection of diameters DN5000/DN3800mm two spray saturator. Spray saturator ammonium sulfate production process, using the spray saturator, made ??of stainless steel, long life equipment, set pickling absorption, crystallization, acid, evaporation as a whole, with the gas system resistance, crystalline particles large (average diameter 0.7mm), ammonium sulfate good quality, short process, easy operation. Process design and instructions This design is composed of nine parts: The first and second part is introduction, it mainly introduces the present situation of coal coking and thiamine purpose and production method. The third part introduces the spray saturator principle of production of ammonium sulfate crystallization principles, factors and production of ammonium sulfate crystallization process. The fourth part carries on the detailed calculation on the equipment and equipment model were determined. The fifth part explains the arrangement of each part in detail. The sixth part explains civil engineering, water supply and drainage, power supply, heating and ventilation, meter project, project, equipment maintenance, etc. for details. The seventh part explains the main control index in this section, operating rules, open positions parking operation, labor capacity and job responsibility. The eighth part listed the equipment of thiamine section uniformly . The ninth part explains the d

文档评论(0)

weidameili + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档