公寓楼毕业设计作品.docx

  1. 1、本文档共51页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中文摘要 木工程为广西大学行建文理学院学生公寓楼工程,采用框架结构,主体为七层, 本地区抗震设防烈度为六度第一组,场地类别为II类场地。基本风压为 0.35KN/mm2o楼、屋盖均采用现浇钢筋混凝土结构。 本次毕业设计中,第一部分设计是结构部分的设计,在这部分设计中,首先进 行的是结构选型,根据各结构体系的优缺点,及木工程的实际情况,在符合经济 的条件下,采用钢筋混凝土框架结构体系。其次进行结构平面布置,根据荷载情 况,在满足结构受力合理,荷载传递简捷、梁宜拉通,避免凌乱,及满足建筑要 求和方便施工等原则下,进行纵、横向梁布置,并根据规范和经验公式,进行主 次梁截面初步估算。手算第九轴框架上的荷载,用Pk计算其框架结构 计算配 筋施工 1 Student apartments Abstract The project is an apartment building for xingjian college in Guangxi University. It adopts framework structure with seven-stores building as its main body. Seismic fortification intensity of the area is six-time Group 1 and its venues category is the second venue. The basic wind pressure is 0.35KN/mm2. Building and roof adopt cast-in-place reinforced concrete structure. The first part in the graduation design is the structure. In the design of the part, we first do selection of structure and then under economy-permitted condition adopt reinforced concrete framework structural system according to advantages and disadvantages of every structural system and actual situation of the project. Second, we set up plane structure. According to load and in the principles of satisfying reasonable force structure pimple load transfer, easy beam pull and avoiding disorder and satisfying construction demands and facilitating construction, we set up longitudinal and horizontal beam and have preliminary estimates about primary and secondary beams section according to norms and empirical formula. The load of nine-floor frame is done by hand,and the nine-floor frame is computed and reinforced by PK. I built a whole buiding model with PMCAD .then to counte it with SATWE. In the design process, we also adopt Tarch and Auto CAD software as an auxiliriary. The second part Maily be constrution:Carry on amount of engineering covariance to constrution design do,complete engineer quantity detailed list,and to construte the project do a choice of reasonable and complete the draw of the plan and construction plane chart of the constrution progress o

文档评论(0)

ggkkppp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档