网站大量收购闲置独家精品文档,联系QQ:2885784924

思科的数据中心虚拟化项目解决方案_SEVT_Jiapeng.ppt

思科的数据中心虚拟化项目解决方案_SEVT_Jiapeng.ppt

  1. 1、本文档共61页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * * * * * * Illustrate problem Make the server switch part of the boundary Server: transparent/cosistent Network: unchanged Network on the bottom Re-use blurry/sharp imagery * * * * * * * * * * * * * Transcript: And no plan is complete without a roadmap and we had to develop this roadmap mostly from the funding area. Because although we did get permission to go out and do the strategy, like any IT organization, you have to absorb the costs into your operational model. So we went out, we projected that we could complete this project by 2013. But we had to work backwards and come up with areas of benefit that we were going to actually drive costs out of our operating environment so we could depreciate the capital investment and really prove to the operating committee that we were running Cisco more efficiently. And with that, I know this is kind of like eating an elephant from a long-term point of view, but we divided up into key areas that we really thought we could drive a lot of costs out of our operating model. And really return that back to Cisco and then allow us to keep on building out our data center strategy. And I think this is really key too for getting that approval is to really have a strong plan on how youre going to drive costs out of your data center operating environment. * Transcript: and were trying to migrate a majority of our applications away from Solaris and HPUX into the Linux environment. And that will enable our server virtualization strategy. Author’s Original Notes: TO whoever keeps these stats on the C-o-C oracle. We have 317 production data bases that consume 209 Terabytes of space A total DB population of 1,313 consuming 1.17 Petabytes of space. * Transcript: The four key areas that we focused on was cross-pollination, improved utilization. And we really started out to really save money and drive costs out of the (inaudible) environment. But what we found out by really virtualizing the environment, that it reduced our server

文档评论(0)

文档分享 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档