二焊点摩擦的调试ASM.ppt

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2nd bond multi-stage introduction * ASM Pacific Technology Ltd. ? 2009 page * Background Background The current bonding structure is base on the standard bonding flow Search – enhancer – contact – scrub – base – release - tail The disadvantages of current structure Unable to add scrub at each stage Unable to switch from force control to position control during 1st bond and 2nd bond This structure is not flexible for further requirement * ASM Pacific Technology Ltd. ? 2009 page * 2nd Bond Multi Bond Stages – Features Maximum 6 Bond Stages are supported in each wire 2nd bond group. Auto convert old Scrub control Parameters to Multi Bond Stages Scrub control Parameters New parameters added Bond Stage Selection Scrub Control Mode Scrub Delay Scrub Bond Time – user can key in scrub bond time if scrub cycle is set to 0 BH move distance BH move speed factor BH touch down speed factor BH touch down tolerance factor BH touch down control * ASM Pacific Technology Ltd. ? 2009 page * Bond Stages Selection Setting Interface View All Bond Stages Scrub Disabled Some Bond Stages Scrub Enabled All Bond Stages Scrub Enabled * ASM Pacific Technology Ltd. ? 2009 page * Scrub Control Mode Setting Interface View Z-Scrub is only available to Pre Ctact, Pre Base and Pre Release stages. User can configure SPC1, Scrub and SPC2 are applied with force control or position control by adjust the below one parameter. BH Touch Down Control * ASM Pacific Technology Ltd. ? 2009 page * BH Move Control for Z scrub After SPC2 Before SPC2 With Scrub Before Scrub Before SPC1 BH move up Before SPC1 Touch Down BH move up always before SPC1 BH Touch Down Control has 5 options as below SPC1 Scrub SPC2 * ASM Pacific Technology Ltd. ? 2009 page * Multi Bond Stages – parameters -1 New parameters added Scrub Delay -ms User can set a delay time before scrub start, normally applied if force changes from high to low Scru

文档评论(0)

meimeiting123 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档