- 1、本文档共44页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Accepted Manuscript
A model for simulating schedule risks in prefabrication housing production: a case
study of six-day cycle assembly activities in Hong Kong
Clyde Zhengdao Li, Xiaoxiao Xu, Geoffrey Qiping Shen, Cheng Fan, Xiao Li,
Jingke Hong
PII: S0959-6526(18)30646-2
DOI: 10.1016/j.jclepro.2018.02.308
Reference: JCLP 12255
To appear in: Journal of Cleaner Production
Received Date: 30 August 2017
Revised Date: 24 February 2018
Accepted Date: 28 February 2018
Please cite this article as: Clyde Zhengdao Li, Xiaoxiao Xu, Geoffrey Qiping Shen, Cheng Fan,
Xiao Li, Jingke Hong, A model for simulating schedule risks in prefabrication housing production: a
case study of six-day cycle assembly activities in Hong Kong, Journal of Cleaner Production
(2018), doi: 10.1016/j.jclepro.2018.02.308
This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to
our customers we are providing this early version of the manuscript. The manuscript will undergo
copyediting, typesetting, and review of the resulting proof before it is published in its final form.
Please note that during the production process errors may be discovered which could affect the
content, and all legal disclaimers that apply to the journal pertain.
ACCEPTED MANUSCRIPT
1 A model for simulating schedule risks in prefabrication housing production: a
2 case study of six-day cycle assembly activities in Hong Kong
3
4
5
6
7
1
ACCEPTED MANUSCRIPT
8 Abstract:
9 The construction industry in Hong Kong has been exposed to serious housing
10 production issues such as insufficient manpower, safety, environmental concerns and
11 inefficient housing supp
文档评论(0)