- 1、本文档共52页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Modules don’t fit We don’t expect students to read this chart. It is an abstract view that shows the many to many relationships among the symptoms and root causes, and between the root causes and practices. It is meant to indicate that we have done the mapping, so they don’t have to. Animation notes: This animation is automatic. It shows the tracing from symptoms to root causes to the best practices we will discuss. R: Requirements Analysis D: Design C: Coding, Unit Testing T: Subsystem and System Test Iterative processes were developed in response to these waterfall characteristics. With an iterative process, the waterfall steps are applied iteratively. Instead of developing the whole system in lockstep, an increment (that is, a subset of system functionality) is selected and developed, then another increment, etc. The selection of the increment to be developed first is based on risk, the highest priority risks first. To address the select risk(s), a subset of use-cases are chosen. The minimal set of use-cases that will allow objective verification (i.e., through a set of executable tests) that this risk has been addressed, is developed. Then the next increment is selected to address the next highest risk, and so on. The waterfall is thus applied at the increment level and the system evolves incrementally. In the iterative approach, the waterfall is applied to a single increment of the system at a time. Each iteration produces an executable. Animation note: The graphic automatically wipes right The earliest iterations address greatest risks. Each iteration produces an executable release. Each iteration includes integration and test. Iterations help: resolve major risks before making large investments. enable early user feedback. make testing and integration continuous. focus project short-term objective milestones. make possible deployment of partial implementations. Iterative processes were developed in response to waterfall characteristics. With an iterative
您可能关注的文档
最近下载
- 《6. 观察与比较》教学设计2024-2025学年科学一年级上册教科版(2024).docx VIP
- 《基于UbD理论的小学数学单元教学设计研究》课题研究方案.doc
- 部编本小学语文3~6年级单元主题及核心素养表.docx
- 群联(PS2303PS2251-03刷ISP固件详细量产修复教程.doc
- 小班科学《风车转起来》PPT课件.ppt VIP
- 2020年工业机器人行业市场分析调研报告.docx
- 民航服务心理与实务 课件 模块4项目3 识用旅客个性心理与服务.pptx
- 第三单元名著导读《朝花夕拾——二十四孝图》知识点梳理 部编版语文七年级上册(教师版).pdf
- 间歇性导尿技术及操作步骤PPT课件.pptx VIP
- 现代工程设计制图习题集第五版王启美答案.pdf
文档评论(0)