- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第 PAGE 3 页 共 NUMPAGES 5 页
SAP-ECC System Design for Speed Project
2006-08-15 Lin Jie
Project Background……………………………………………………………………...2
Range of Implement……………………………………………………………………...2
Business Requirements..………………………………………………………………..2
Solution………………………………………………………………….………………….2
Process Layout………………………………………………………………….…..2
System Design….…………………………………………………………….……..3
Schedule……………………………………………………………………………….…...4
Team Members..……………………….…………………………………………………..4
Risk Estimate……………………………………….…………………………….………..4
Budget……………………………………………………………………………………….5
1 Project Background
Business Background:Improve Xxx brand product competitiveness in AP, by leveraging the advantage of china products, supply chain, service and business management experience.
IT Background: For success of MCS project, a simple adjustment to ERP system is permitted. The modification for system flow and logic is omitted.
Stratagem background: Because all oversea business will be achieved in Singapore Trading Hub project on Feb 2007. So the current solution is temporary.
2 Range of Implement
SAP-ECC system configuration(Exclude reports interfaces development and ERP peripheral systems).
3 Business Requirements
Independent settlement: The revenue, profit and inventory cost should be settled to AP GEO.
Offshore model: AP GEO BP (Wave 1: ASEAN) trade with HK company (0011) directly.
Cross company sales: Sale products manufactured in PRC mainland via HK company (0011) ;
(Further information refer to Speed project_GSC整体业务方案_v1.3”.)
4 Solution
4.1 Process Layout
AP
AP
BP
HK
0011 Company
1110 Sales Org
AP FG Plants
Beijing 2118
Shanghai 0497
Mfg Plants
Beijing 2117
Shanghai 0498
Delivery
Sales
Billing 2
Billing 1
Delivery
4.2 System Design
SAP-ECC system configuration design:
Two Profit Center and Business Area will be built. One is AP consumer DT that is assigned 0011 company and Xxx Beijing; another is AP Consumer NB that is assigned 0011 company and Xxx Shanghai.
Two AP FG plants will be built. One
您可能关注的文档
- ERP项目-用户操作手册-FICO-005-应收往来核算(1).docx
- ERP项目-用户操作手册-FICO-006-财务月结(1).docx
- ERP元件编码规则体系22222.docx
- ERP整体架构规划_v2.2.6_汇报稿.ppt
- FI_优化业务蓝图设计_V3.2_20090422222222.docx
- FI02-组织结构和会计子模块.ppt
- FICO_SSH_003 应收日常业务_V1.02.doc
- FICO_SSH_004 发票校验_供应商主数据切换_V1.0.doc
- FICO_SSH_010 实际成本结算_V1.02.doc
- FICO_SSH_011 有采购订单的固定资产采购_V1.02.doc
文档评论(0)