- 1、本文档共156页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Typical Pennsylvania DangerousHighwall Reclamation Project;The Monongahela South No. 1 Dangerous Highwall Reclamation Project was very unique project and everything but a Typical Reclamation Project;Site of the Whiskey Rebellion;Project Location;Background;Site Conditions;St. Anthony’s Church;St. Anthony’s Parochial School;St. Anthony’s Parish House;The Problem;Sign at End of Church Street above Highwall;Highwall – West End of Site;Highwall – Middle of Site;Highwall – East End of Site;High Potential for Continued Rock Falls – School Closed;Design Summary;Selected Alternative;Design Challenges;Design Challenges;Design Challenges;Contracting Summary;Project Construction;Site Access;Access from State Route 481 – Park Avenue;Access Around Parish House;Access Between Highwall and Buildings;Staging Area / Parking Lot;Erosion and Sedimentation Controls;Slope Reduction – Eastern End of Project Site;Initiation of Excavation for Highwall Slope Reduction – East End of Project Site;Bench on Cut Slope;Excess Spoil Disposal;City of Monongahela Disposal Site;Incidental Coal Extraction;Pittsburgh Coal Seam (Avg. Seam Thickness 6-8 feet);Coal Seam Covering;Wire Mesh Reinforcement;Fiber - Reinforced Grout Application;Finished Coal Seam Covering – Looking West;AMD / Stormwater Collection System;Upgrade of
Storm Sewer
System along
Park Avenue,
SR481;New Storm
Sewer System
for St. Anthony’s
Parking Area
and Church
Street Runoff;Conveyance Channel on Cut Slope Bench;Installation of Mine Drainage Conveyance Pipeline;Installation of Mine Drainage Conveyance Pipeline;Sealing of Mine Entries;Mine Opening at Base of Finished Cut Slope;Mine Entries Cleaned Out;Perforated Mine Drain Pipe Installed in Each Entry;Mine Entry Back Stowed with Stone;Block Wall Seal Construction;Finished Mine Seal Construction;Mine Grouting for Subsidence Control;Grout Injection Boreholes;Grout Injection Borehole;Rock Face Support System;Drilling Anchor Holes;Materials;Materials;Installing Rock Netting Bolts;Finish
您可能关注的文档
- 20190316起重吊装作业安全管理培训精美版1.pptx
- 动物生命活动调节高三复习.pptx
- 话题1认识幼儿园教育活动.pptx
- 保利德阳项目市场定位及营销策略竞标提案.pptx
- 一个美丽的神话故.pptx
- 假村管理假村的设计.pptx
- ⑨流动的组织——血液.pptx
- 水电解质代谢紊乱2011.pptx
- 设计院协同管理软件介绍新图文.pptx
- 颅脑疾病阅片12.pptx
- 有机肥料及微生物肥料相关项目投资计划书范文 .pdf
- 医院消防维保服务投标方案(技术方案).doc
- 宣传视频制作技术服务方案(技术方案).doc
- 2024-2025学年江苏省南通市如皋市八年级(上)期末考试数学试卷(含答案) .pdf
- 主体劳务工程 投标方案(技术方案).doc
- 校外教育杯征文 浅谈如何做好小学班主任工作 .pdf
- 人教版九年级全册 Unit 5 What are the shirts made of ?Section B 2a-2e 分层练习(含答案).doc
- 人教版九年级全册 Unit 5 What are the shirts made of? Section B 3a-Self Check 分层练习(含答案).doc
- 人教版九年级全册Unit 6 When was it invented Section A 1a-2d练习(含答案).docx
- 市场营销学》试卷(答案).docx
文档评论(0)