- 1、本文档共37页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
To complete the above-mentioned activities, at intermediate stations, there are different tracks, for example, arrival and departure track, lead track and freight track, passenger transport facilities, i.e., station buildings, passenger platform, canopy and crossing equipment, as well as freight transport facilities like warehouse, freight platform, loading and unloading machinery. 2. District Station Most district stations are found in medium-sized cities or at the start or end of locomotive traction section (routing of passenger or freight locomotives). At these stations, some or all the locomotives of trains running through adjacent sections are changed and locomotive crew shifted. Furthermore, the stations may be tasked with certain technical operations for transit trains without resorting, a certain volume of break-up and resorting of freight trains and passenger and freight transport. Steam locomotive diesel?locomotive electric?locomotive Discussion 2 How far is it between two adjacent district stations? Steam locomotive 100-200km diesel?locomotive 200-400km electric?locomotive 600-800km or more Passenger transport facilities Freight transport facilities Transport facilities: arrival and departure track, shunting track Locomotive facilities Car/Vehicle facilities lateral layout 3. Marshalling station Marshalling station is often arranged at the junctions of several main lines in the railway network and equipped with a complete set of shunting facilities to disintegrate and marshall large number of freight trains. Discussion 3 1.Why should freight trains be disintegrated and marshalled? 2.Will all freight trains be disintegrated and marshalled? shunting yard hump camel platform of hump crest Pushing section part rolling section part Hump is shunting equipment for disintegrating freight trains. The car will slip by itself by means of height difference and car weight. Reducer/ retarder Iron shoe lateral layo
您可能关注的文档
- Financial Technology Blockchain technology foundation 区块链技术基础.pptx
- Financial Technology Cloud Finance 云计算在金融领域的运用.pptx
- Flash基础 飞舞的蝴蝶 飞舞的蝴蝶(ppt).pptx
- Flash基础(苗苹) 旋转的树叶 旋转的树叶(1).ppt
- GMDSS普通操作员 MSI in GMDSS第01讲:单选1-20 MSI in GMDSS第01讲:单选1-20.ppt
- GMP实务 设备状态标识管理 设备状态标志.pptx
- GMP实务 物料发放 物料发放.pptx
- GNSS定位测量 坐标系统 1课件坐标起源与发展 1.pptx
- GNSS定位测量 坐标系转换及点校正 课件-点校正工作原理.pptx
- J2EE企业级项目开发-1期 开发Struts2应用 任务1-1 开发第一个Struts2应用.ppt
- 安全生产考核奖惩制度3篇.doc
- 颅脑损伤病人的护理查房【优质公开课】精品PPT课件模板.pptx
- 二零二二年度德州继续教育公需科目《公共事务管理与服务能力》试题及答案.pdf
- 二零二二年度党风廉政建设知识竞赛题库(含答案).pdf
- 二零二二年度度枣庄市专业技术人员继续教育公需科目培训班互动题.pdf
- 二零二二年度儿童保健学试题库(含答案).pdf
- 二零二二年度第十九届中国东南地区数学奥林匹克竞赛高一试题(含答案).pdf
- 二零二二年度动物卫生监督题库(含答案).pdf
- 黑龙江省大庆市重点中学2023-2025学年高一下学期2月开学考试英语试题(含解析).docx
- 二零二二年度法检书记员招考《公基》测试题库(含答案).pdf
文档评论(0)