- 1、本文档共3页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
NPS (Nominal Pipe Size)
Nominal Pipe Size (NPS) is a set of standard pipe sizes used for pressure piping in North
America. The same pipe dimensions are used with different names in Europe
Pipe size is specified with two non-dimensional numbers: a Nominal Pipe Size (NPS) and
a schedule (SCH). The relationship of these numbers to the actual pipe dimensions is a bit
strange. The NPS is very loosely related to the inside diameter in inches, but only for
NPS 1/8 to NPS 12. For NPS 14 and larger, the NPS is equal to the outside diameter
(OD) in inches. For a given NPS, the OD stays constant and the wall thickness increases
with larger SCH. For a given SCH, the OD increases with increasing NPS while the wall
thickness increases or stays constant. Pipe sizes are documented by a number of
standards, including API 5L, ANSI/ASME B36.10M in the US, BS 1600 and BS EN
10255 in the United Kingdom and Europe, and ISO 65 internationally.
For NPS of 5 and larger, the DN is equal to the NPS multiplied by 25 (not 25.4).
The most commonly used schedules today are 40, 80, and 160. There is a commonly held
belief that the schedule number is an indicator of the service pressure that the pipe can
take. For example, the McGraw Hill Piping Handbook says the schedule number can be
converted to pressure by dividing the schedule by 1000 and multiplying by the allowable
stress of the material. However, this is not true Pressure rating actually goes down with
increasing NPS and constant schedule.
The various standards for pipe schedule are not identical. Frequently some sizes—or even
entire schedules—are present in some standards but not others. When different standards
do overlap, they usually have the same dimensions. For this reason, the source of the
schedules is not distinguished in the table below. Beyond NPS 8, however, there are
differing version of schedules 5, 10, 40, and 80. One variation is the presence or absence
of an S suffix after the schedule number
您可能关注的文档
- Nordic nRF52832蓝牙芯片的优势和详解.pdf
- Normalized Cuts and Image Segmentation_Jianbo Shi and Jitendra Malik_规范化切割与图像分割.pdf
- NOS评分量表中文版及实例分析(4页).pdf
- Not until在句首的倒装句.doc
- Notre Dame de Paris_belle_法语音乐剧巴黎圣母院曲谱-20.pdf
- NPMPD 钢轨电位限制装置.pdf
- Nport5230 简易使用说明.doc
- Ns3网络仿真系统软件介绍.pdf
- NSAID胃溃疡治疗(科室会) 0120.ppt
- NSP715说明书_正式版.pdf
文档评论(0)