- 1、本文档共168页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* P61 Phase 2 – Airbus Performance */168 5 or 10 Nautical Miles (JAA) 5 Statute Miles (FAA) Intended track En route limitations Lateral clearance * P61 Phase 2 – Airbus Performance */168 Engine failure(MCT) Green dot Gross Flight Path Gross ceiling Net Flight Path Net ceiling Gross Flight Path Net Flight Path Min 1,000 ft Min 1,000 ft En route limitations Vertical clearance (1,000 feet) * P61 Phase 2 – Airbus Performance */168 Gross Flight Path Min 2,000 ft Engine failure(MCT) Green dot Net Flight Path Drift down ceiling En route limitations Vertical clearance (2,000 feet) * P61 Phase 2 – Airbus Performance */168 Continuing Point (B) Located Before the No-Return Point (A) B Before A : Return After B : continue A Net Flight Path 2,000 ft 2,000 ft Net Flight Path En route limitations Vertical clearance * P61 Phase 2 – Airbus Performance */168 En route limitations Vertical clearance Continuing Point (B) Located After the No-Return Point (A) B A Before A : Return After B : continue Divert Net Flight Path Net Flight Path 2,000 ft 2,000 ft * P61 Phase 2 – Airbus Performance */168 En route limitations Vertical clearance Performance Requirement Above Diversion Airport 1,500 ft Net Flight Path Drift down ceiling Gross Flight Path Green dot Engine failure(MCT) * P61 Phase 2 – Airbus Performance */168 A B C 60 min 1 eng inop. ETOPS Approval Twin-engines aircraft Figure 3.5: ETOPS (60 Minute Rule) A, B, C, Diversion airports ETOPS segments En route limitations * P61 Phase 2 – Airbus Performance */168 A B C 90 min All eng. 2 engines inop. A, B, C, suitable airports Three or four-engines aircraft Figure 3.7: Two Engines Inoperative (90 Minute Rule) Critical segments En route limitations * P61 Phase 2 – Airbus Performance */168 Oxygen Systems: Chemical Systems Gaseous systems Passenger Oxygen Supply Requirement: En route limitations In flight cabin pressurization failure * P61 Phase 2 – Airbus Performance */168 En route limitations Descent profiles and obstacle clearance F
您可能关注的文档
- A330飞机研讨课件:A330机型SOP研讨.pptx
- A330飞机研讨课件:AF447航班空难.ppt
- A330飞机研讨课件:ENHANCED.ppt
- A330飞机研讨课件:GPS 高度 VS 气压高度.ppt
- A330飞机研讨课件:In-Flight Landing Performance.pptx
- A330飞机研讨课件:POWER PLANT ABNORMAL OPERATION.ppt
- A330飞机研讨课件:POWER PLANT NORMAL OPERATION.ppt
- A330飞机研讨课件:POWER PLANT PRESENTATION.ppt
- A330飞机研讨课件:PRM程序简介.ppt
- A330飞机研讨课件:SOP与QAR.ppt
文档评论(0)