- 1、本文档共113页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MineSched V6 Underground ProductionSchling
MineSched V6 Underground Production
Sch
ling
December 2008
Copyright ? 2008 GemcomInternational..GemcomInternational publishes this documentation for
Copyright ? 2008 Gemcom
International.
.
Gemcom
International publishes this documentation for the sole use of MineSched licenses.
Without written permission you may not sell, reproduce, store in a retrieval system, or transmit any part of the documentation. For such permission, or to obtain extra copies please contact your local Gemcom Office.
Gemcom
International
Level 8 190 St Georges Terrace Perth, Western Australia 6000 Telephone: (08)Fax: (08)While every precaution has been taken in the preparation of this manual, we assume no responsibility for errors or omissions. Neither is any liability assumed for damage resulting from the use of the information
contained herein.
All brand and product names are trademarks or registered trademarks of their respective companies.
Contributors
Aaron Loffler Gemcom
International
Perth, Western Australia
Products
MineSched 6.0
Surpac 6.1
Document Release Date
December 2008
Table of ContentsOverview 5Data Storage and Familiarisation 6Task: Setup Data Management Hierarchy 6The Surpac Production Interface 6Task: Set
Table of Contents
Overview 5
Data Storage and Familiarisation 6
Task: Setup Data Management Hierarchy 6
The Surpac Production Interface 6
Task: Set Your Working Directory 7
The MineSched Production Interface 7
Data Review 9
Data Editing and Management 13
Creating Stopes 13
Block Model Reporting 13
Task: Report Figures from Model 13
Notes on Partial Percentages 15
Task: Report Stope Tonnes and Grades Using Partial Percentages 18
Polygons for Graphical Results 18
Task: Produce Polygons for Graphical Results 18
Block Model Material Classes 22
Task:
ine Material Classes for the Sch
le 22
MineSched Scenario Management 25
Creating a Scenario 25
Task: Create a Scenario 25
Navigating the Scenario 27
Step Navigator 27
文档评论(0)