- 1、本文档共56页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
空预器安装说明书 Air Preheater Erection Procedures Manual (英文版)
PAGE
PAGE 4
Air Preheater Erection
Procedures Manual
(F031OYA001XXXX)
WRITTEN BY: CHEN GUOZHONG
CHECKED BY: WANG CHANGXIA
REVIEWED BY: JIANG SHUHAI
APPROVED BY:
CHIEF ENGINEER:
HARBIN BOILER COMPANY LIMITED
November 29, 2008
INDEX
1. General introductions…………………………………………. ……. 2
2. Field Erection Procedures for Modular Air Preheaters………… 2
2.1 Suggested Field Erection Sequence Summary…………………… 2
2.2 General Field Erection Guidelines for Modular
Air Preheaters………………………………………………………. 4
2.3 Field Erection Procedures for Modular Air Preheaters……… 6
3. Air Preheater erection procedure checklist………………………… 32
3.1 General Structure…………………………………………………... 32
3.2 Rotor…………………………………………………………………. 33
3.3 Support Bearing Assembly…………………………………………. 33
3.4 Guide Bearing Assembly…………………………………………… 34
3.5 Rotor Drive Assembly………………………………………………. 35
3.6 Hot End Sector Plate Assemblies………………………………….. 36
3.7 Cold End Sector Plate Assemblies………………………………… 37
3.8 Axial Seal Plate Assemblies………………………………………… 38
3.9 Hot and Cold Static Seal Assemblies……………………………… 38
3.10 Rotor Seal Assemblies…………………………………………….. 39
3.11 Rotor Stoppage Alarm Assembly………………………………… 40
3.12 Wash Pipe Assembly……………………………………………… 40
3.13 Fire Suppression System Assembly……………………………… 40
3.14 Soot Blower………………………………………………………… 41
3.15 Water Cooling System…………………………………………….. 41
3.16 Fire Detecting System……………………………………………... 42
3.17 Oil Temperature System…………………………………………. 42
General introductions
These instructions are mainly about generalized erection guide of Ljungstrom Air Preheater. Erector shall prepare the detailed Erection Procedures based on this manual and erection drawing according to the actual situation.
Refer to the related instructions for the stoppage alarm system, rotor drive and the controlling system, fire detection device, cleaning device, leakage control system and oil lubrication system for details.
Field Erection Procedures for Modular Air Preheaters
Suggested Field Erection Sequence Summary
您可能关注的文档
- XX机电公司《桅杆起重机技术使用说明书》.doc
- 上海铱控PMU当地主站软件操作手册(linux版本)WORD版.doc
- 上海华明SHM-D分接开关数控操作机构使用说明书.pdf
- 上海铱控风电场功率自动控制系统项目技术说明书WORD版.doc
- 平高集团LW35-252T4000-50型自能式六氟化硫断路器安装使用说明书WORD版.doc
- 平高集团GW4-126VI高压交流隔离开关安装使用说明书.pdf
- 上海铱控VP-EC216同步相量测量子站(PMU)技术说明书.pdf
- 华软恒信风功率预测系统使用说明书WORD版.docx
- 上海铱控火电AVC软件操作手册(linux版本)WORD版.doc
- 深瑞BP-2CAL-F DA-G母线保护装置技术使用说明书.pdf
文档评论(0)