- 1、本文档共43页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Delay Management and Disruption Management Outline 1. airline disruption management 2. on-time performance measurement and statistics reporting 3. inherent delay of an airline network 4. schedule optimization and network reliability 1. airline disruption management Airline Operation Centre (AOC) AOC centrally manage operational disruption that may occur in day-to-day operations and provide various units of an airline with tactical disruption recovery plans. The major function of an AOC, besides overseeing daily operations, is to co-ordinate recovery actions among different units within an airline such as crewing, ticketing and maintenance by “optimally” allocating limited operational resources, while minimizing extra operating costs due to disrupting recovery. Depending on the scale of disruptions, there are different recovery tactics. Minor disruptions refer to those ones that cause initial delay less than an hour, while major disruptions refer to the cases in which flights are delayed for longer than an hour. 1.1 Minor disruptions and recovery tactics Airline operations are subject to stochastic disruptions due to various reasons such as weather conditions, equipment readiness, passenger handling, and aircraft turnaround procedures. Most disrupting events only cause “minor” delay to certain operating tasks, and do not necessarily cause flight departure delays. Flight delays only occur when delays cannot be absorbed by the built-in schedule buffer time. Flight delays may propagate in an airline network due to resource connections. In the similar minor disruption scenario, airlines which operate point-to-point networks have little (or none) issues with passenger re-accommodation due to missing connecting flights. Nevertheless, crewing and aircraft routing plans in a point-to-point network are still affected and for some cases, are affected more seriously due to the tight resource connections in a point-to-point network. Regarding the recovery of passenger iti
您可能关注的文档
- 航空公司运营与管理Airline Operations at airports.ppt
- 航空公司运营与管理chapter4Enroute Flight Operations in Airline Networks.ppt
- 航空公司运营与管理Managing Airline Ground Operations.ppt
- 《无土栽培学》全套教学课件.pdf
- 中国乐凯胶片集团公司2024年招聘3人历年(高频重点提升专题训练)附带答案题库(有一套).docx
- 企业税收筹划咨询合作协议.doc
- 中国乐凯胶片集团公司2024年招聘3人历年(高频重点提升专题训练)附带答案完整版汇总.docx
- 原木柜子施工方案.docx
- 厦门顶墙施工方案.docx
- 中国乐凯胶片集团公司2023-24年春季招聘24人高频100题难、易错点模拟试题附带答案通关秘籍题库.docx
- 中国中车集团有限公司整理校园招聘公开引进高层次人才笔试答案题库含答案(突破训练).docx
- 中国乐凯胶片集团公司2023-24年招聘193人高频考题难、易错点模拟试题附带答案大全(有一套).docx
- 中国中车集团有限公司招聘80人历年高频考题难、易错点模拟试题附带答案真题题库(有一套).docx
- 药用冰箱故障停电应急预案.pptx
- 中国乐凯胶片集团公司毕业生专项招聘生产储备岗模拟试题附带答案及参考答案(综合题).docx
- 中国乐凯胶片集团公司完整版春季招聘24人高频100题难、易错点模拟试题附带答案大全附参考答案(达标题.docx
- 药物半数有效量(ED50)的测定.pptx
- 压实垫层施工方案.docx
- 中国乐凯胶片集团公司定向招聘历年高频难、易错点模拟试题附带答案真题题库附参考答案(基础题).docx
- 压滤机安装施工方案.docx
文档评论(0)