- 1、本文档共82页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
5. the optimal turnaround time---analytical methods In order to evaluate the potential impact of schedule changes on flight delays and delay related costs, an analytical model, called the Turnaround Time Allocation (TTA) optimization model is introduced in this section. The objective of this model is to provide airline schedulers with an evaluation tool that can be applied at the stage of schedule planning for different scheduling considerations. Delay development mechanism (1) the arrival delay is shorter than the scheduled buffer time; (2) if the arrival delay is larger than the scheduled buffer time, the resulting departure delay may develop according to one of three scenarios. First, departure delay may develop in a linear form proportional to the amount of arrival delay, no matter how long the arrival delay is. Second, ground handling agents maintain efficient turnaround operations, the level of departure delay will be less than the one of inbound delay. Third, ground operations are further disturbed by the late arrival of inbound aircraft, via late transfer of passengers, late passenger check-in, late baggage connection, or disruptions in ground handling plans. One major responsibility of airline dispatchers at airports is to deliver punctual departures by “operational means”. Ways in which this can be done include: skipping the loading of some cargo or goods that are not urgent, or allocating more resources to speed up aircraft turnaround. The curve slope (m2) after the turnaround buffer time is used to define the “efficiency” of ground services, i.e. the ground handling agents’ capacity to respond to schedule perturbations. The “efficiency” of delay absorption of schedule buffer time is modeled by m1, which is the slope of the left portion of Curve B. The operational efficiency of aircraft turnaround operations in dealing with delays and resource constraints is modeled by m2, which is the slope of the right portion of Curve B. The relationship between
您可能关注的文档
- 航空公司运营与管理chapter4Enroute Flight Operations in Airline Networks.ppt
- 航空公司运营与管理chapter5 Delay Management and Disruption Management.ppt
- 航空公司运营与管理Managing Airline Ground Operations.ppt
- 《无土栽培学》全套教学课件.pdf
- 兰州连城铝业有限责任公司招聘应届高校毕业生88人高频难、易错点模拟试题附带答案及参考答案(预热题).docx
- 兰州连城铝业有限责任公司招聘71人公开引进高层次人才笔试参考题库答案题库及答案【必刷】.docx
- 兰州连城铝业有限责任公司历年招聘3人历年(高频重点提升专题训练)附带答案完整版(历年真题).docx
- 兰州连城铝业有限责任公司历年招聘71人公开引进高层次人才笔试参考题库答案王牌题库附参考答案(综合卷).docx
- 兰州连城铝业有限责任公司招聘172人公开引进高层次人才笔试参考题库答案题库及答案【有一套】.docx
- 兰州连城铝业有限责任公司内部使用毕业生专项招聘生产储备岗模拟试题附带答案大全各版本.docx
- 兰州连城铝业有限责任公司2024年招聘应届高校毕业生88人高频难、易错点模拟试题附带答案真题题库及参.docx
- 直联式真空泵项目安全风险评价报告.docx
- 兰州连城铝业有限责任公司2024招聘193人高频考题难、易错点模拟试题附带答案完整版标准卷.docx
- 兰州连城铝业有限责任公司2024年招聘1人历年高频考题难、易错点模拟试题附带答案真题题库附参考答案(.docx
- 兰州连城铝业有限责任公司2024年春季招聘24人高频100题难、易错点模拟试题附带答案完整题库及答案.docx
- 固定照明设备项目风险分析和评估报告.docx
- 兰州连城铝业有限责任公司2024年定向招聘历年高频难、易错点模拟试题附带答案题库含答案【突破训练】.docx
- 兰州连城铝业有限责任公司2024年招聘172人公开引进高层次人才笔试参考题库答案内部题库带答案(典型.docx
- 兰州连城铝业有限责任公司2024年招聘193人高频考题难、易错点模拟试题附带答案王牌题库(研优卷).docx
- 兰州连城铝业有限责任公司2023-24年招聘193人高频考题难、易错点模拟试题附带答案大全【全国通用.docx
文档评论(0)