- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Tenants of Single Piece Flow;;Check, Do, Verify;Process;Check, Do, Verify;Check, Do, Verify;Single piece or one piece flow is a means to primarily build
Quality into the process. This is achieved by establishing a takt
Time, developing std work, and swip. The premise is that an
Operator can only work on one piece at a time, and performs a
Quick quality check on the CTQs of the process before moving
The part to the following process. If a defect is detected, Jidoka
Is enacted…the line is stopped, and immediate action is taken
To remediate the situation and take countermeasures to prevent
reoccurence;One Piece Flow ;;One Piece Flow ;Tenants of 1 pcs Flow;System of manufacturing in which the final process
withdraws the parts it needs from the preceding
process at exact timing intervals, in the exact
standardized amount needed.;;;Leveled production meanslowering the peaks amongthe daily production volumesas much as possible and making the production flow smooth and unflucuating. In general, the more fluctuations you in the production flow, the more muda you end up having. That is because the capacity and capability of a line tends to be set at a level that meets the peak production demand rather than the average demand. If the production line produces only a single product, you may be able to reduce muda simply by adjusting the production schedule and staffing level. But if you want to produce consistently at an average level where you have many different kinds of products to produce in a single line, you have to do the averaging not just in volume but in kinds as well. This way of averaging both volume and in kinds is called production leveling or heijunka in Japanese.; Leveled Load Production;Need to Determine . . .;Setting the production sequence of multiple TRAM – RAC Types (Med Systems Product);Since these three products are on the same line, you will need to follow the sequence pattern of 1-2-1-3 in your production mix. By doing it this way you are ab
您可能关注的文档
- 結計裊程管制SPC.pptx
- 红五角行动让TA上学★义卖活动策划.pptx
- 素质测评的基本概念.pptx
- 素质课11《果品营养与医疗保健》(XXXX1122).pptx
- 素质模型及任职资格管理.pptx
- 素质模型与任职资格管理培训教材.pptx
- 系统集成项目管理工程师_18_项目风险管理.pptx
- 系统销售培训学习资料.pptx
- 系统抽样和分层抽样.pptx
- 系统的问题解决方法.pptx
- 2024年学校党总支巡察整改专题民主生活会个人对照检查材料3.docx
- 2025年民主生活会个人对照检查发言材料(四个带头).docx
- 县委常委班子2025年专题生活会带头严守政治纪律和政治规矩,维护党的团结统一等“四个带头方面”对照检查材料四个带头:.docx
- 巡察整改专题民主生活会个人对照检查材料5.docx
- 2024年度围绕带头增强党性、严守纪律、砥砺作风方面等“四个方面”自我对照(问题、措施)7.docx
- 2025年度民主生活会领导班子对照检查材料(“四个带头”).docx
- 国企党委书记2025年度民主生活会个人对照检查材料(五个带头).docx
- 带头严守政治纪律和政治规矩,维护党的团结统一等(四个方面)存在的问题整改发言提纲.docx
- 党委书记党组书记2025年带头增强党性、严守纪律、砥砺作风方面等“四个带头”个人对照检查发言材料.docx
- 2025年巡视巡察专题民主生活会对照检查材料.docx
文档评论(0)