- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Tenants of Single Piece Flow;;Check, Do, Verify;Process;Check, Do, Verify;Check, Do, Verify;Single piece or one piece flow is a means to primarily build
Quality into the process. This is achieved by establishing a takt
Time, developing std work, and swip. The premise is that an
Operator can only work on one piece at a time, and performs a
Quick quality check on the CTQs of the process before moving
The part to the following process. If a defect is detected, Jidoka
Is enacted…the line is stopped, and immediate action is taken
To remediate the situation and take countermeasures to prevent
reoccurence;One Piece Flow ;;One Piece Flow ;Tenants of 1 pcs Flow;System of manufacturing in which the final process
withdraws the parts it needs from the preceding
process at exact timing intervals, in the exact
standardized amount needed.;;;Leveled production meanslowering the peaks amongthe daily production volumesas much as possible and making the production flow smooth and unflucuating. In general, the more fluctuations you in the production flow, the more muda you end up having. That is because the capacity and capability of a line tends to be set at a level that meets the peak production demand rather than the average demand. If the production line produces only a single product, you may be able to reduce muda simply by adjusting the production schedule and staffing level. But if you want to produce consistently at an average level where you have many different kinds of products to produce in a single line, you have to do the averaging not just in volume but in kinds as well. This way of averaging both volume and in kinds is called production leveling or heijunka in Japanese.; Leveled Load Production;Need to Determine . . .;Setting the production sequence of multiple TRAM – RAC Types (Med Systems Product);Since these three products are on the same line, you will need to follow the sequence pattern of 1-2-1-3 in your production mix. By doing it this way you are ab
文档评论(0)