X1市给水工程开端设计
摘 要
X1市位于湘南省西部,是一个陈腐而美丽的城镇,位于溆水中游,近期筹划人口12万人,远期生长到20万,市区已建了一座3万m3/d的水厂。随着经济的生长、用水量的增长,现有供水能力已满足不了正常的生产和生活所需。凭据都会总体筹划,拟在溆水上游建立一新水厂。新水厂建成后,与老厂联合向管网供水,形成统一供水的局面。
本设计的主要内容包罗:取水构筑物设计;净水厂设计;输配水管网设计;工程概预算四部分。
凭据都会管网供水的需要,盘算得新水厂近期供水范围为5万m3/d,远期为10万m3/d。为包管出水水质,所以新水厂处理惩罚工艺接纳通例处理惩罚+深度处理惩罚(臭氧-生物活性炭),增加深度处理惩罚后,能使出厂水水质明显提高。工程建立总投资为 9373.65万元,单元制水本钱为0.85元/。
要害词:取水构筑物,净水厂,通例处理惩罚工艺,V型滤池,配水管网,概预算
Abstract
As an ancient and beautiful city, X1 city is located in the west of Hunan. On the middle reaches of Xu River, the city has a planning population of 120,000 which, in long term, will be expanded to 200,000. There has already been a 30,000 m3/d waterworks in the downtown area. With the development of economy and the increasing demand of water, its current water supplying capacity can not meet the requirement of regular production and people’s daily life. According to the city’s comprehensive planning, it is proposed that a new waterworks should be constructed on the upper reaches of Xu River. When it is completed, the new waterworks will be joined by the old one to supply water to the pipe network, thus making a state of unified water supply.
This design mainly covers four parts which are: the water intake works, the purification plant, the tubeweb system of carrying and providing water, and the budgetary estimation of the design.
According to the demand of the pipe network, it is calculated that the short-term water supply scale of the new waterworks is 50,000m3/d and the long-term one is 100,000m3/d. The water treatment process of the new water treatment plant introduces both the conventional treatment and the advanced treatment so as to remove the hazardous substances; Adding advanced treatment, the quality of the effluence will be improved obviously.
The total investment of the design is 93,736,500Yuan and the cost analysis per unit is 0.85Yuan /m3.
Key words: water intake works, purification plant,routinely processing,V-shaped filter chamber,water dist