- 1、本文档共191页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Auxiliaries 419
(a) (b)
Figure 15.74 a and b Water cooled charge air coolers
temperature drop afforded by the hi gher performance coo lel
would be increased by 50%.
Counterflow As the den sity of the charge air is increased by cooling , it is
Two pass lowered by reduction in pre ssure occasioned by the air passing
_Crossflow
Single pass ( through the cooler. A reduction in den sity due to thi s effect is
clearly in direct proportion to the ratio of the pressure at outlet
Parallel
z o r 一 from and inlet to the cooler. For this reason , it is possible to
flow
tolerate a higher pressure drop through a cooler operating with
』 目 a turbocharger giving a higher rather than low巳r pressure rat lO
您可能关注的文档
- 金属波纹管涵在羊曲电站对外公路Ⅲ标的应用.pdf
- 南京农副产品物流中心屋顶光伏发电项目可行性研究报告.pdf
- 发动机管理系统技术培训.pdf
- 锐志发动机维修手册.pdf
- 3RZ发动机 维修手册.pdf
- 黄河上游水电开发有限责任公司龙羊峡水光互补二期530MWp并网光伏电站工程 可行性研究报告第二篇(审定稿) 水光互补分析.pdf
- 酉阳县大河口电站库区移民后扶项目苍岭镇南溪村红旗路口至苏家湾及小垭口至偏岩子公路硬化工程招标文件.pdf
- 庆景青公路滩坑电站淹没段复建工程_施工监理招标文件.pdf
- 长龙山抽水蓄能电站上下库连接公路B段工程实施性施工组织设计.pdf
- 惠州抽水蓄能电站永久公路工程_投标书.pdf
文档评论(0)