- 1、本文档共32页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Manufacturing Engineers 1 Rev. 2, June 1998 Ford Production System Manufacturing Engineers 2 Rev. 2, June 1998 Ford Production System Manufacturing Engineers 3 Rev. 2, June 1998 Ford Production System Manufacturing Engineers 4 Rev. 2, June 1998 Ford Production System Manufacturing Engineers 5 Rev. 2, June 1998 Ford Production System The FPS Principles are our rules and code of conduct. They define what we need to do and the methods we抣l be using to support the FPS Vision. The Objectives are our goals -- what we want the results of our actions to be. We call them 揝tretch?Objectives because they expand or 搒tretch?our views on what we think we can achieve and extend our reach to making these goals possible. The FPS Measurables tell us how well we抮e doing against the objectives we抳e set. The major purpose for the Measurables is to focus our attention on what抯 really important when we do our jobs. Let us look at how the Principles, Stretch Objectives and Measurables specifically relate to each other. Manufacturing Engineers 6 Rev. 2, June 1998 Ford Production System Manufacturing Engineers 7 Rev. 2, June 1998 Ford Production System SHARP is a detailed quantitative evaluation that emphasizes improvements in health and safety processes. SHARP includes 21 health and safety process elements. These process elements include: Leadership Administration, Accident Incident Analysis, Emergency Preparedness and Facility Ergonomics. SHARP is an extension of the 5-Star Safety Program originally deployed within Ford at Powertrain Operations plants. Manufacturing Engineers 8 Rev. 2, June 1998 Ford Production System Attitude Surveys measure employee attitudes about their jobs and conditions in the work environment. Manufacturing Engineers 9 Rev. 2, June 1998 Ford Production System Manufacturing Engineers 12 Rev. 2, June 1998 Ford Production System The total Dock-to-Dock time for a product includes the time that a product spends as raw material,
您可能关注的文档
- 甘春英蒙娜莎之约.ppt
- 甘临一级公路G242总监办测量培训幻灯片.ppt
- 甘肃C区区域市场管理工作月度总结及下月度的工作计划述职.ppt
- 甘肃省食品安全电子监管平台批发户进销货使用指南.ppt
- 甘肃烟草“陇之情”服务品牌建设幻灯片宣讲的资料.ppt
- 甜品店促销的方案.ppt
- 甜酒酿的制作与酒药中糖化菌的分离.ppt
- 生 命· 死 亡对你来说意味着什么.ppt
- 生为主体学为中心--洋思教改经验解析.ppt
- 生产一致监督检查管理.ppt
- 浙教新版八年级下学期《6 .3 反比例函数的应用》同步练习卷.pdf
- 员工管理手册 (二).pdf
- 注册土木工程师(岩土)考试真题预测考卷含答案解析.pdf
- 苏教版二年级数学上册全册教案.pdf
- 全科主治医师题-皮肤病及性传播疾病.pdf
- 人教PEP小学英语六年级下册期末复习补全对话短文练习(15)附答案解析.pdf
- 人教版 小学 数学 二年级 上册 6 表内乘法(二)7篇 教案合集.pdf
- 人教版(2019)高中生物必修2《遗传与进化》核心知识点复习提纲1.pdf
- 人教版(2019)高中生物必修1 《6.3细胞的衰老和死亡》2023年同步练习卷.pdf
- 主治医师 (康复医学)-专业实践能力(A1型题 2).pdf
我们是专业写作机构,多年写作经验,专业代写撰写文章、演讲稿、文稿、文案、申请书、简历、协议、ppt、汇报、报告、方案、策划、征文、心得、工作总结代写代改写作服务。可行性研究报告,实施方案,商业计划书,社会稳定风险评估报告,社会稳定风险分析报告,成果鉴定,项目建议书,申请报告,技术报告,初步设计评估报告,可行性研究评估报告,资金申请报告,实施方案评估报告
文档评论(0)