网站大量收购独家精品文档,联系QQ:2885784924

Mazda开发流程介绍20151112.ppt

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Information classification level C: Internal use Information classification level C: Internal use CMA Program Development Flow * Types * Types: FSS(Full Service Supplier): Supplier is responsible for product designing, 3D date release, samples prepare ( Spec is provided by Mazda, B drawing is done and released by supplier), till MP (SOP) and manufacturing. For J53R IP/CNSL program, it is defined as FSS. But Mazda/CMA release the Spec/Drawings, and supplier finishes the 3D data design and D drawings. Actually, this program is done like BTS program. Supplier is responsible for all about product. So Mazda/CMA basically will not pay for any cost of engineering changes. Types * Types: BTS(Build To Spec ): According to Spec/Drawings from Mazda/CMA, supplier finish the 3D data with detail structure and upload the data to Mazda/CMA. Also supplier manufactures and prepares samples in order to support each gates, till MP(SOP) and manufacturing. (Mazda/CMA release B drawings, and supplier finish 3D data design and D Drawings) Such as:J53R IPM CNSL Supplier need to meet all the requirements in SPEC/Drawings for Mazda/CMA. Basically, Mazda/CMA will not be responsible for any cost of engineering changes caused by any requirements in the Drawings missed. Types * Types: MTP(Make To Print): According to 3D data or Drawing s from Mazda/CMA, supplier manufactures and prepares samples in order to support each gates, till MP(SOP) and manufacturing. Such as:J48 IP,J64 DP Basically the same as YFAI BTP * Quotation CMA: Release RFQ Workshop 2 Workshop 1 commercial negotiation finish Program Start YFAI: Submit human resource plan/ /Timing plan/ Issue list , etc.(Details see attached format ) Submit design concept/ update issue list , etc.(Details see attached format ) Detail document requests are listed in the next page. * Quotation Detail documents requests in workshop1 and workshop2 for FSS/BTS/MTP supplier: Here is the attachment Requirement of Workshop Meeting for J72A as a e

文档评论(0)

左畔 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档