物业创优指导目录01.doc

  1. 1、本文档共75页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
物业创优指导目录01 XXXX小区创优资料总目录 shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arms length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider 小区花园(小区) 创优资料总目录 第一项基础管理 1(1按规划要求建设,房屋及配套设施投入使用 1(1(1关于同意项目立项的批复 1(1(2关于结合新建修建防空地下室的批复 1(1(3关于更名的批复 1(1(4关于花园门牌的申请 1(1(5关于花园B、C栋住宅初步设计的批复 1(1(6关于XXX花园总平面方案审批意见的请示 1(1(7建设用地批准书 1(1(8国有土地使用证 1(1(9国有土地使用权出让合同 1(1(10投资许可证 ( 1(1(11建设工程规划许可证 1(1(11建设工程规划许可证(电缆工程) 1(1(12建筑工程施工许可证 1(1(13红线图 1(1(14小区总平面图 1(1(15商品房外销许可证 1(1(16预售商品房屋登记备案证明 1(1(17电梯安装开工审批表 2he small pipe to achieve thermal expansion compensation and, if necessary, considersing tet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline ue manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inl0.004) to drain. Enter the pipe should be smooth flow to the lateral, intak-n the drain pipe must have a certain slope (abo

文档评论(0)

语子 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档