- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
E13Test requirements for Rotating Machines(1996)
(Rev.11. GeneralMay 2001)
(Corr.1 All machines are to be tested by the manufacturer.
May 2004)(Rev.2 Manufacturers test records are to be provided for machines for essential services, for other
Aug 2015) machines they are to be available upon request.
(Corr.1June 2018) All tests are to be carried out according to IEC 60092-301.
All machines of 100kW and over, intended for essential services, are to be surveyed by the Society during test and, if appropriate, during manufacturing.
Note: An alternative survey scheme may be agreed by the Society with the manufacturer whereby attendance of the Surveyor will not be required as required above.
Shaft Material
Shaft material for electric propulsion motors and for main engine driven generators where the shaft is part of the propulsion shafting is to be certified by the Society.
Shaft material for other machines is to be in accordance with recognised international or national standard.
Tests
Type tests are to be carried out on a prototype machine or on the first of a batch of machines, and routine tests carried out on subsequent machines in accordance with Table 1.
Note: Test requirements may differ for shaft generators, special purpose machines and machines of novel construction.
Note:
Rev.2 of this UR is to be uniformly implemented by IACS Societies for rotating machines:
when an application for certification of a rotating machine is dated on or after 1 January 2017; orwhich are installed in new ships for which the date of contract for construction is on or after 1 January 2017.
The contracted for construction^^ date means the date on which the contract to build the vessel is signed between the prospective owner and the shipbuilder. For further details regarding the date of contract for constructionn, refer to IACS Procedural Requirement (PR) No. 29.
Table 1
No.
Tests
A.C. Generators
Motors
Type test1)
Routine test2)
Type test1)
Routine test2)
1.
Examination of the technical
您可能关注的文档
- 四月中旬全国执业护师实践能力第五次复习题含答案.docx
- 十二月全国药士考试第一阶段一周一练(含答案).docx
- 北京科技大学锻造答案.docx
- 公司安全目标管理制度.docx
- 会计核算办法(1).docx
- 中学语文教研活动设计方案.docx
- 三月中旬公路工程管理与实务二级建造师考试能力测试.docx
- 【新】开展鼠疫防控知识宣传活动简报.docx
- 《登泰山记》《项脊轩志》课文重点知识挖空练习+答案(校对版).docx
- 《你就是孩子最好的玩具》读书笔记.docx
- 某县纪委监委开展“校园餐”突出问题专项整治工作汇报22.docx
- 中小学校园食品安全与膳食经费管理专项整治工作自查报告66.docx
- 某县委常委、宣传部部长年度民主生活会“四个带头”个人对照检查发言材料.docx
- XX县委领导班子年度述职述廉报告3.docx
- 某县纪委关于校园餐问题整治工作落实情况的报告.docx
- 中小学校园食品安全与膳食经费管理专项整治工作自查报告22.docx
- 某县税务局党委领导班子年度民主生活会“四个带头”对照检查材料.docx
- 某县委书记在县委常委班子年度民主生活会专题学习会上的讲话.docx
- 某县纪委校园餐问题整治工作落实情况的报告.docx
- 某区委副书记、区长年度民主生活会对照检查材料.docx
文档评论(0)