外研社新时代职业英语水利英语教学课件Unit_4.pptx

外研社新时代职业英语水利英语教学课件Unit_4.pptx

  1. 1、本文档共41页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
;;;? 1 Three Gorges Hydropower Station ? 2 Xiangjiaba Hydropower Station ? 3 Xiluodu Hydropower Station ? 4 Longyangxia Hydropower Station ;;Reading Skill;In a hydropower station, also called a hydroelectric power station, water is an essential resource. The amount of hydroelectric power that can be developed at a site depends on the volume of the stream flow and the height from which the water drops. Rivers running down steep slopes usually have good sites for hydropower stations. A typical hydropower station includes a dam, a reservoir, penstocks, a powerhouse, and an electrical substation. Before the construction of a hydropower station, a thorough investigation is made to establish a general plan and determine its feasibility. This investigation generally covers the stream flow and electric power, foundation conditions, necessary reservoir capacities and water levels, land required, the project layout, the number and size of generating units required, and estimated costs.;1. The amount of hydroelectric power that can be developed at a site depends on the volume of the stream flow and the height from which the water drops. (Para 1) 某一地点的水力发电量取决于水的流量大小和水落差的高低。 在本句中,that 引导定语从句,补充说明先行词hydroelectric power;“介词through + 关系代词which”同样引导定语从句,介词与关系代词是介宾关系, 可还原为the water drops through the height。 2. This investigation generally covers the stream flow and electric power, foundation conditions, necessary reservoir capacities and water levels, land required, the project layout, the number and size of generating units required, and estimated costs. (Para 2) 该调查的内容一般包括流量和电力、地基条件、所需水库容量和水位、所需土地、项目布局、所需发电机组数量和规格及预算成本。;Various combinations of dams and waterways can be built to use the energy of falling water and so to produce hydroelectric power. Some stations on the upper Yangtze River are examples of a stair-step structure in which each reservoir extends to the base of the next dam upstream, thereby making full use of available heads. In such cases, a powerhouse is usually bui

您可能关注的文档

文档评论(0)

allen734901 + 关注
实名认证
内容提供者

知识共享

1亿VIP精品文档

相关文档