- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PAGE 3 Case Study for Chapter 1 and 2 A company exported a batch of goods on the basis of CFR. Because of negligence, it failed to notify the importer of the loading and shipment. As a result, the importer did not insure the goods timely. Not long after the vessel left for the destination, it ran aground and sank, causing total loss of goods. The importer lodged a claim against the exporter and asked for compensation for the lost goods. However, the exporter refused to compensate for the lost goods because the lost happened after the goods were on board the vessel. So the risks should borne by the importer. Disputes then arose. Question: Who do you think should hold responsibilities for the loss? Why? An exporting company finalized a deal with a foreign company with the terms of CIF Landed London. The contract stipulated that the quantity of the goods was 500 cases with L/C and shipping in May. The buyer issued the letter of credit to the seller under the contract. After the successful shipment of goods, the seller took the procedure for negotiation within the period for presentation of document and then received the payment. Soon, the seller received the buyer’s receipt of unloading and import declaration fee for the goods received in London, and requested the exporting company to pay the buyer the amount of the money in the receipt. Question: Does the exporting company need to pay this cost, and why? A company exported a batch of strong seasonal goods to a British customer on CIF terms. The two parties agreed to stipulated in the contract: The buyer should send the relative L/C before the end of September, while the seller should guarantee that the vessel arrived at the port of destination by December 2nd. Once the vessel arrived at the destination later than December 2nd, the buyer has the right to cancel the contract. If payment has been made, the seller should return it to the buyer. Question: Do you think the contract signed like this is correct? A Chinese i
您可能关注的文档
最近下载
- 4.1中国特色社会主义进入新时代课件(共46张PPT)高中思想政治统编版必修1(内嵌音频+视频).pptx VIP
- 抖音短视频创业合伙协议(二人合伙 一方运营 一方出镜)避坑版.docx
- 低压配电设计规范GB50054—2011.pptx VIP
- 2025国家消防安全知识竞赛题库及参考答案(通用版).docx VIP
- 卢崇汉第二届扶阳论坛讲稿.doc VIP
- BG-V3-D37-2012-0003 电气拆车报告.pdf VIP
- BG-V3-D36-2011-0001 按钮操作力测量报告-V2.docx VIP
- 大中型企业安全生产标准化管理体系要求.docx VIP
- BG-V3-D37-2012-0002 动作电流测量报告.doc VIP
- 高中思想政治统编版(部编版)必修1 中国特色社会主义4.1中国特色社会主义进入新时代 课件(19张ppt+1视频)(含音频+视频).pptx VIP
文档评论(0)