- 1、本文档共38页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
STMZ-FP System
History
• Low Pressure system - 9 5/8”4.00 bore (STMZ,
STDZ, DTMZ)
• Low Pressure System - 7”3.25 bore (DTMZ, STDZ)
• Excessive Seal Damage
• Tool Sticking
• Load Collet to position the tool
• Low pressure (2-3000 psi) Isolation packers
• Low Pum rates ( 12 BPM)
STMZ-FP System
Current Status
• New Quadra Seals for Improved life and reduced
sticking
• Higher Pressure 9 5/8”4.75 bore system (5,000 psi)
• Weight down ShurMAC Multi-Acting Collet
• Higher Frac Rates
STMZ-FP System - Run Lower Service Tool
STMZ-FP System - Hang the lower seal unit
with the lower service tool in the slips
STMZ-FP System - Run the upper completion tools and
screen. Run washpipe to latch the lower service tool.
STMZ-FP System
STMZ-FP System - Latch the washpipe to the
lower service tool
STMZ-FP System - Pull the service tool into
position
STMZ-FP System - Set the slips and remove
the latching mechanism
STMZ-FP System - Run the inner concentric
string (Inner Tube for MPA)
STMZ-FP System - Sting in and test the inner
string (fluid level test only)
STMZ-FP System - Attach the packer assembly
STMZ-FP System - Be sure the Crossover
Ports are below the lower MCS
STMZ-FP System - Run to bottom and sting into
the sump packer. Snap in and out to be sure.
STMZ-FP System - Drop the setting ball and set
the upper packer
STMZ-FP System - Pressure up and expend
the setting ball
STMZ-FP System - Setting ball lands below the
crossover - may reverse out - have a catcher in
the lines.
STMZ-FP System - , pressure up and
set the isolation packers
STMZ-FP System - Pack one zone at a time
STMZ-FP System - Packoff seals the upper
annulus. Circulation is possible
STMZ-FP System - lower zone packed
STMZ-FP System - packing subsequent zones.
Collet in position.
STMZ-FP System - Returns and pressure
monitoring above the upper zone.
STMZ
您可能关注的文档
- tcm培训设备操作.pdf
- 11美容院0415收到签名表.pdf
- 标记方案2 june2013评分计划结果年夏季国际gcse4es0试卷2听力.pdf
- rpgmakermv基础教程第四期.pdf
- GB/T 45153-2024老龄化社会 照顾人员包容性组织通用要求与指南.pdf
- 中国国家标准 GB/T 45153-2024老龄化社会 照顾人员包容性组织通用要求与指南.pdf
- 《GB/T 45153-2024老龄化社会 照顾人员包容性组织通用要求与指南》.pdf
- JJF 1544-2024拉曼光谱仪校准规范.pdf
- 《JJF 1544-2024拉曼光谱仪校准规范》.pdf
- 计量规程规范 JJF 1544-2024拉曼光谱仪校准规范.pdf
文档评论(0)