- 1、本文档共3页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
【精选】浙江省⾼考英语⼆轮复习语法填空提升练⼗⼀冠
词
语法填空提升练(⼗⼀) 冠词
[考点巩固练]
1.He owned farm,which looked almost abandoned.
2.(2017·浙江杭州七校联考)For a while,especially in the U.S.,city life came to be seen as the best and most exciting way to
live.Living in the rural areas was regarded as
boring.Who wanted to be struggling to make living in the country doing hard agricultural labor?
3.(2017·浙江台州期末)He realized he hadn’t seen his new puppy for over hour.
4.This is by far most inspiring movie that I have ever seen.
5.As he approached the bridge,the sound got louder and then he saw pitiful sight.
6.Recently when he tooklook at his collection of books,he discovered the old book borrowed 61 years ago.
7.But a parent of another child came up witheven better idea—getting the whole class to learn sign language along with
Zejd.
8.Most seriously,relying on sm artphones to make friends does not give us same advantage
as making new friends in the real world.
9.For your generation to live in better world,there is so much more our generation can do.
10.We’re up there together at a height of 30,000 feet,enjoying miracle of the modern flight.
[语篇强化练]
A
(2017·⼭东潍坊期中)
The major construction work on the world’s longest cross-sea bridge,which connects Zhuhai in Guangdong Province with
Hong Kong and Macao,1.(comple te) last week.
Near the airports of Hong Kong and Macao,the project is over one of the w orld’s
2.(busy) shipping routes(航线),
3. more than 4,000 ships pass by every day.Much to
pe ople’s relief,Chine se white dolphins,an endangered species,enjoy top level national
4.(protect) here.
5. big ceremony was held in Zhuhai to celebrate the completion of the 55-km cross-sea route and to mark the start of road
surfacing.“This means the construction has entered
6.(it) final stage,” said Zhu Yongling,head of the work.
More than 400,000 tons of steel have been used for the 6.7-km undersea tunnel and
22.9-km bridge,enough 7.(build) 60 Eiffel Towers.Two floating cranes,8. a load of 3,
文档评论(0)